You'll find a new temporary wall was built in the new lobby to protect us from the Rectory demolition that will occur. The majority of the raised seating area will be off limits (i.e. behind the wall). However, we will maintain access to the front door, the ramp, side entrance to the church and walkway to the new restrooms.
We'll have heat in the church through a creative temporary measure from Hensel Phelps as we await the reconnection of the gas line.
School building will be completely down by the end of the week. They are already doing interior demolition in the gym. Major gym demolition starts next Monday.
Sanctuary reinforcing wall in Rectory basement is close to being poured, rebar is in place for grade level slab.